Home > Video Channel > Flooring, Plumbing, and Plastering

Flooring, Plumbing, and Plastering

The old flooring has been removed and Bob outlines the process of installing the new. LVL supports allow a restructuring of the house with larger rooms. Plumbing and plastering work are also covered.
Get Adobe Flash Player to see this content.

Chapters from this episode

Clip Transcript For:

Flooring, Plumbing, and Plastering

  computer-generated transcript - may not be 100% accurate

" So Luke has taken up all the old flooring. And before we can go any further the subfloor here everything it's quite irregular so you -- we cut down sleepers and patches in several places. Just to get everything level and now we can bring down plywood which is this dirty floor from. He can be as it is the plywood that is very resistant to and resistant to moisture so it's a good with the use of any area where you might have to worry about water. You laminate violence. And now this. We're joined now by Al Cummings and Neal Kaplan who are. Professional carpenters that are going to be helping -- work here and this is an LVL. Laminated veneer lumber structural member that's going down it's 50%. More. Sturdy or strong than dimensional lumber and what we want to do it this end now is just to inch it up that last bit of is to put up four by four is. Has put the -- and there. And up top. And this will help us. One more one more are in the retrofit. I could shut that's that's that now we can drive some nails and it's. So these Georgia Pacific LVLs which we've got. In this area over here as well. Are allowing us to restructure the whole house -- so that we can have one big open expanse you again have them doubled up here in notice they're resting on the header above the window and the load is transferred to either side. And so at this point the only remaining piece of old structure that has to go is and it's. Just a couple of days ago the plumbers were here. And went through. Go to work and snapping to get rid of the old cast iron stack that was right alongside this post. Chris Stewart from gem plumbing you already relocated the stack above us in the kitchen area into the outside wall. And so all the waste from the upstairs and from the kitchen come down here what is it that has to happen here in the transition from PVC to the old cast --"

" Brought it down into a swept band so it doesn't. Bang immediately. From the cast iron swept. It's just like that yes what that refers to the curve that's been put into it right here that's correct. And it is -- a rubber coupling from the transitioning from the pastime to the PVC. They're nice simple and they really work well -- and refused one over -- the cop. Critic cut off some other cast iron pipe that's no longer previews of this."

" Cap and there's no adhesive or glue necessary up next job. The final support column from the old structure has been removed and all of the new framing for the kitchen remodel is complete. We have a nice open area for the new kitchen. Now the plastering contractor gets to work first they hang blue board and then cover all the joints with mesh -- Once the plaster is mixed. Jean Olivier and his crew are ready to skim coat the walls and ceiling."

" now -- letting her assailant. -- time witness. What about me -- fifteen minutes. And then we didn't hurt. -- And or if there's look that they don't all -- applied with which enables us -- We've got it nice inside. Corner. Between -- policy when. It was packet they didn't act. As a classic hits us. We can shape it."

 [-]


More Videos »Related Videos

Sweating a Joint in Copper Plumbing
Sweating a Joint in Copper Plumbing

The plumber Steve Bowton shows Bob how to sweat a joint in copper plumbing. First he cleans the pipes with an emery cloth. Then he explains that plumbers no longer use lead solder and instead use a tin and antimony mixture to protect homeowners from lead poisoning. Then he puts flux on the pipes and the fittings. Places the fixture on the pipes and levels it, then solders the joints. The flux helps draw the solder into the space.

Electrical Wiring and Plumbing for a Basement Bathroom
Electrical Wiring and Plumbing for a Basement Bathroom

Bob explains how remodeling a basement presents owners with options they didn't realize they had. In the Melrose home project, a space previously used as a little paint closet was converted to house a half bathroom that is badly needed in a home with only one bathroom for its four members. The area was reframed and the staircase restructured to accommodate the room. Al Leone of Plumbers Union Local Number 12 installed the new piping using PEX flexible tubing. Electricians were then called in to rewire the area. Electrician John Schiavone installed the wires, circuits, switches, and outlets.

Reworking the Existing Plumbing
Reworking the Existing Plumbing

Bob reviews the work done on the existing plumbing once all the waterproofing and flood-prevention measures are put in place in the basement. Al Leone of Leone Plumbing Corp. first cut the pipes into sections for easy removal. The cast iron pipe was cut and removed using a special pipe cutter. Bob explains that Leone is a union contractor who decided to go into business for himself. His helper, Matthew Orlando, is going through the apprentice training program through the Plumber and Gas Fitters Local Union Number 12 in Boston. The chapter spends $4,500 a year to put each apprentice through a thorough five-year training program where they spend two nights per week learning about everything from bathrooms to hospital gas work. Leone demonstrates some of the specialized work he does to install the pipe, including using oakum, a joint runner, and poured hot lead to form a joint seal. Leone then shows how some of the other seals are put in place in the pipe.

Installing Plumbing Loop and Fixtures for Multiple Head Shower
Installing Plumbing Loop and Fixtures for Multiple Head Shower

Bob tours the upstairs master bath with an eye towards the space's luxury appointments, including the double vanity fixtures, granite countertop, and Wellborn cabinets. Plumber Dave DuVerger is installing a trim package to finish off the spacious shower. The shower features three showerheads in a nearly six-by-six foot enclosure. To supply enough water pressure, these are built on a plumbing loop with a 3/4-inch supply line.

Related Products & Services Showrooms

Columns, Pillars, Pilasters & Balustrades
Columns, Pillars, Pilasters & Balustrades

Chadsworth offers a complete line of columns, pillars, pilasters, and posts for both interior and exterior use, with plain or fluted shafts in Wood-all species of lumber (stain- and paint-grade), their award-winning PolyStone', Composite, Fiberglass (molded and spun-cast), and PVC. All sizes and

Repair, remodel and restore with the new Multi-Max
Repair, remodel and restore with the new Multi-Max

…material you can cut thanks to this incredibly versatile tool. With a few simple blade changes the Multi-Max lets you cut metal, PVC, pipe, flooring and drywall. Removing glued down carpet Getting rid of old carpet used to be a time consuming, difficult…