Chapters from this episode
Now Playing
Now Playing
Now Playing
Now Playing
Clip Transcript For:
Delivery Day Overview
computer-generated transcript - may not be 100% accurate
" All right now this at this point this is going thank gangbusters guys. What are they doing up there right now Bob what they're doing is they're going to be putting in the game gable end panels there those -- small triangle pieces. And once you put those cookies someplace they're gonna flip the top half of that roof section onto the gable all right. Yeah Bob again if you remember these roof sections were built in the plant and at that time reported out defensive system. It's a a double folding hand -- what it does a lot of the roof to pivot in two positions. And the roof actually as you can see it lays down flat and again these are things that are done for our industry to help provide. The opportunity for that -- over a system would be below shipping height right so. What we're looking at now is the underside which will be the attic if you well. And what I'm curious about is how are they gonna flip it up that's -- large section of roof well they may get some assistance from the crane. Afterwards strap on it it'll. That it once they do flip it over there -- can see there's not some drop been. Or this on the walls. That would put down no rest right onto yeah kind of yeah that. It's really starting to take the shape of -- house now. Yes it is."
" Well in real time we were looking at more like a twelve -- day for this fantastic team of house builders to put all these parts together. The last pieces that came on site involved the roof system or the master bedroom wing that box that's isolated on the right over here. And in fact we also had a panelize through -- system that went on at the other end where the sun room is located."