Clip Transcript For:
Building a First-Floor Slab and Walls With Concrete
computer-generated transcript - may not be 100% accurate
" Because covers. Okay so Ron we're standing on the actual concrete slab. Let's go through the steps what have reversed it first we erected the sidewalls out of her -- foam block right OK. And then we we stand. Indeed the entire floor with foam decking. It's it's finish deep decking. Which grooves in it OK and then we've temporarily supported that with false work every six feet to support until concrete sets. But what about the steel. Well. You did these grooves every two feet are for steel and you put steel in there which serves much like a parking garage who went into a parking garage see these beams coming down sure and we're actually doing that we're forming it right here -- I -- and then the other element that's already included in there is the pex tubing right yes and that's put down on top of the foam. After the steel was put in after the steel reinforced -- And then on top of that on top of the tax there's a rule -- measure mesh that goes down and then we --"