Home > Video Channel > OpenJoist 2000

OpenJoist 2000

Open Joist 2000 is an engineered wood system designed to maximize solid-sawn lumber strength while minimizing lumber waste. This truss and joist system features fully trimmable joists that are ordered to length from an inventory that is maintained by the manufacturer. These joists feature an open-webbed design that allows wiring and pipes to be run through the joists, without the need for a drop ceiling or lost headroom.
Get Adobe Flash Player to see this content.

Clip Transcript For:

OpenJoist 2000

  computer-generated transcript - may not be 100% accurate

" Hi I'm Steve -- here Bob Vila isn't as you white house on this project we're going to be using open web joist and the joists are stronger and lighter and much more cost effective. This product is made by open -- 2000. Let's go talk to mark bush -- in find out how her maiden."

" How'd it work. Open -- 2000. Is a floor truss its mainly used for. Joist on the floor. As you can see this product has opened web. Meaning that so you don't have to drill holes or anything like that the ducts can be inserted in the winds like so. And then it can be inserted anywhere you want to. All along the joist. You can run all your plumbing electrical. Ducks through that -- without adding structural features of the house and keeping the the original design. Of this energy -- house. This will give you a good open web system without damaging the structural aspect the joist itself when you put him -- for another big advantage of this Joyce has. Is because of the and block the -- you can trim on site five and a half inches on both hands for a just ability. This also has another advantage where you can buy this product. From your local lumberyard. At every foot increments and then once again on site -- instrument back to make it it. This a joist. Is manufacture wood finger joints. As you'll notice there are no. Play connectors on the Jones. It's held in together with fingers in a waterproof glue. This will prevent rattling sound from plumbing. It's gonna help you in the recovery of your joist if it's loaded them properly is going to recover better than if you do on metal plate connectors. Because of the unique design. Of this house. Walls are at 45 degrees sixty degrees third -- never nine degrees this product is quite unique that it hand. Comedy these walls by being -- mobile on site. We do supply engineering drawings or installed Rawlings to accommodate the framer."

" That he will be putting the right -- that the right location. Open joist 2000. Designs floor system that will tie every joist together to make it less bouncy less vibration. By tying the whole floor together -- tuba fours two by six which we in the industry calls strong back. Tie the whole floor together so it doesn't matter where you are before the load will be evenly distributed. So the whole floor system make an -- strong dirty floor."

" The other advantage this product path. Is because of its wide surface. The subfloor. Plywood audio is being that is nailed to the joists itself. Gives it a sturdy and much quieter surface to nail into. When you do walk on this for you gonna feel like you're walking solid four. Is -- personal balance there's little squeak one important factor. We're using would open Jewish 2000 is that every piece. Is tested to twice the design mode. Before coming out of the plan for your shall war of day high quality product before you get an on site. Open -- 2000 can be used in a single family home like this one. It can be used in renovations remodeling it can be used in multifamily or light commercial application. Any type of application in the construction industry can use -- 2000."

" Not only are these joists more cost effective because the stronger in the lighter they can span longer distances. But there also more efficient for the environment because they're using smaller pieces of timber. They're much more resource efficient."

 [-]


More Videos »Related Videos

Installing a Drop Ceiling to Hide Ductwork
Installing a Drop Ceiling to Hide Ductwork

Bob walks through the Manhattan Brownstone floor-through apartment with project manager Chris Vila, looking first at the ductwork that has been run in the ceiling for the forced air heat. He then joins John McEvoy of Thorough Construction for a look at the drop ceiling installation they will be using to hide the ductwork and mechanicals in the ceiling. This Chicago bar system allows the crew to hang a perfectly level drywall ceiling instead of following the uneven pattern of the existing joists. First an anchor is screwed into the joists. A pencil rod is then fitted into the hole in the anchor and bent to hang from the joist. A lasar level marks the exact position for the kelly clips that will hold the main stays or block irons in place. The Chicago bar is then clipped to the block irons with a spaghetti clip to create a grid for the new drywall. The drywall will be screwed directly into the suspended Chicago bar.

Reviewing the Completed Demolition
Reviewing the Completed Demolition

The furred out walls from the 1940s, the oringinal lathe and plaster, and all the extra building materials have been removed from the 1890s Brownstone, leaving the original brick party walls. This allows for rigid insulation along the walls and built-out framing for the new windows. There has been a discovery during demolition -- original cornice work all around the perimeter of the front room, tthat was hidden by a drop ceiling, was found in near perfect condition. The plan is to restore it and skim coat the original ceiling, building back the areas where sleepers were hung to support the suspended ceiling. Now that the drop ceilings have been removed, the ceiling heights are 12.5 feet throughout. Looking up, Bob marvels at the quality workmanship of the craftsmen from the 1890s whose joistwork with cross bracing is still evident. Alongside the original joistwork is the cobbled job from a 1940s conversion that will need to be remedied during reconstruction.

Remodeling Before Baby
Remodeling Before Baby

Bob talks with Nick Beasley, owner of a home in Melrose, Massachusetts. Beasley reviews how he and his family bought a two-family home in Melrose. The house was originally built as a single-family home but was later converted. Beasley and his wife are expecting a baby in six weeks. Maggie Beasley shows Bob the basic layout of the house and the improvements they have made. Maggie Beasley reviews the colors of the living room, dining room, and kitchen that were selected with the help of a colorist. She shows Bob the kitchen and expresses the hope that they will be able to upgrade their kitchen safety in advance of the baby's arrival. On the third floor, there is a nursery, two bedrooms, and a small room the Beasleys will convert to a bathroom. A larger master bath will be created during this project, with the smaller bath moving to the hall. Nick Beasley reviews the demolition of the existing small bath and the new partition wall that has been built to frame out the new space.

Related Products & Services Showrooms

Research & buy radiant barrier and save energy
Research & buy radiant barrier and save energy

…Barrier INSTALLATION Instructions INSTALLATION Tips How Much Do You Need BEST Attic Installation Method OSB Plywood Sheathing Results You Can Expect Savings You Can Expect Radiant Barrier Reviews About RadiantGUARD | Buy Radiant…

More Content »More Content

Enhanced Plywood and Subfloor Products
Enhanced Plywood and Subfloor Products

…causing the subfloor to show signs of exposure. Plywood or oriented strand…
…Since then, plywood has become the standard for subfloor applications…
…over OSB, since plywood is a stiffer, longer-lasting subfloor option. It will…

Nailing Subfloor Plywood
Nailing Subfloor Plywood

When nailing subfloor plywood, snap chalk lines on the plywood to indicate the position of each joist. This gives a nailing target to ensure that nails hit the joists for good holding.

Mildew between bathroom subfloor and plywood

…water had soaked the k3 subfloor. When I removed the subfloor I found water stains and mildew on the plywood. Do I need to do…
…other than be sure the plywood is dry before I replace…
…k3? Some of the subfloor under the vanity was…

OSB subfloor w/ 3/8ths inch plywood

…and holds moisture more that plywood. You will need to remove the…
…acception to the original 5/8 plywood (assuming that it is still…
…new tiles, ensure that your subfloor is minimal 1 1/8" thick…
…an additional sheet or 1/2 plywood on your already existing 5…

Browse Topics

Click on a letter to browse content by topic alphabetically.



About  | FAQ  | Contact  | Sitemap  | Privacy Policy  | Terms of Use  | Help  | bobvilacontractors.com

© BobVila.com 2009